Contractors' all-risk insurance
Contractors' all-risk insurance (sometimes referred to as 'contract works insurance') is a policy that covers all risks normally associated with a construction project.
Issued commonly under the joint names of a contractor and a principal client it can protect against:
- The cost of unforeseen loss or damage to building works.
- Machinery movement.
- Public liability.
- Tools.
- Plant owned by the policy holder.
- Plant hired in.
- Business interruption.
- Equipment erection.
Cover is usually provided for the construction period but it can be extended to included the defects liability period too.
Contractors' all-risk insurance is available from a wide range of insurance providers.
[edit] Related articles on Designing Buildings
- 3D animation for insurance risk analysis.
- Business interruption cover under COVID-19.
- Collateral warranties.
- Damage caused by construction works.
- Defects liability period.
- Directors and officers insurance.
- Environmental Impairment Liability (EIL).
- Factors affecting property insurance premiums.
- Future of construction insurance.
- Insurance.
- JCT Clause 6.5.1 Insurance.
- Joint names policy.
- Making sure your builder has appropriate insurance.
- Parent company guarantee.
- Performance bond.
- Professional indemnity insurance.
- Professional Indemnity Insurance clause in conditions of engagement.
- Residual value insurance.
- Retention.
- Risk management.
- Risk register.
- Run-off cover.
- Self build insurance.
- Single project professional indemnity insurance
- Specified perils.
- Subcontractor default insurance (SDI).
[edit] External references
Featured articles and news
Sir John Betjeman’s love of Victorian church architecture.
Exchange for Change for UK deposit return scheme
The UK Deposit Management Organisation established to deliver Deposit Return Scheme unveils trading name.
A guide to integrating heat pumps
As the Future Homes Standard approaches Future Homes Hub publishes hints and tips for Architects and Architectural Technologists.
BSR as a standalone body; statements, key roles, context
Statements from key figures in key and changing roles.
ECA launches Welsh Election Manifesto
ECA calls on political parties at 100 day milestone to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.




















Comments
To start a discussion about this article, click 'Add a comment' above and add your thoughts to this discussion page.